How to Assess the Quality of a New-Build Property
Reading the specification sheet, inspecting the build and spotting marketing that promises more than the contract
This guide answers
- What should I inspect?
- What do floorplans and specifications actually promise?
- How do I identify poor construction, defects and misleading marketing?
With a new build you often judge quality twice: once from drawings and a show flat, and again when your own home is finished. The first judgement decides whether to buy; the second decides what you accept at handover. In both cases the question is the same: what exactly has the developer promised, and does the home deliver it?
The documents that define "quality"
The specification sheet (memoria de calidades). This lists the materials and systems: structure, façade, insulation, windows, floors, kitchen, bathrooms, heating and cooling, electrics. It should be attached to your contract. If a feature is not written down here or elsewhere in the contract, assume it is not promised.
Plans. Floor plans with dimensions and room areas, and the building's general plans. Check that the plans attached to your contract are the same ones the licence was granted for.
The energy rating. New homes must meet Spain's technical building code (Código Técnico de la Edificación), which sets minimum standards for insulation, ventilation and energy use. Ask for the projected energy rating (A–G) and the type of heating, cooling and hot water system. Many new developments use aerothermal heat pumps for hot water and climate control.
Surface areas. Spanish listings may quote superficie útil (usable floor area inside the walls), superficie construida (including walls) or construida con zonas comunes (including a share of common areas). The gap between these figures can be large. Compare like with like and check which figure the price is based on.
Turning marketing words into promises
Brochures are written to sell. Phrases such as "premium finishes" or "pre-installation for air conditioning" are not wrong, but they are not specific. Before signing, ask for the specifics in writing:
- Brands and ranges for tiles, sanitaryware, taps, kitchen units and appliances, or "equivalent quality" defined as the same specification.
- What "pre-installation" means: ducts only, or ducts plus machines? Which rooms?
- What is included in the kitchen: hob, oven, extractor, dishwasher, fridge, washing machine?
- Orientation and views: which way the terraces face, and whether the view could be built out. The location guide shows how to check nearby plots.
- Communal facilities: pool size, gym, garden, and when they will be finished.
Developers usually keep the right to substitute materials of similar quality. That is reasonable, but "similar" should be measurable.
How to use the show flat
Show flats are usually finished to a high standard, sometimes higher than the specification. Ask the sales team to tell you which items are upgrades and which are standard. Take photos of the details you care about (door handles, tiles, skirting, sockets) so you can compare at handover.
Visiting during construction
If you can visit during the build, do. You will see the structure, the insulation and the installations before they disappear behind plaster. Developers usually require visits by appointment and with safety equipment. Ask:
- What insulation is going into the façade and roof?
- How are the terraces being waterproofed?
- What sound insulation is there between flats?
Inspecting the finished home
When the home is ready, you will be invited to a handover visit. Many buyers hire a snagging surveyor at this stage; others use a detailed checklist. Either way:
- Bring tools: a torch, a small spirit level, a phone charger to test sockets, masking tape to mark defects, and your phone for photos.
- Go room by room and test everything that moves, switches or runs water.
- Pour water on terraces and in showers to check it drains.
- Check the shared areas against the plans: garage access, storage rooms, pool, lifts, gardens.
- Write it all down, number each defect, attach photos and send the list to the developer by email.
Signs of poor build quality
Some defects are cosmetic and easy to fix. Others hint at bigger problems:
- Damp patches or musty smells, especially at the base of walls or around windows
- Cracks wider than a hairline, or cracks that run diagonally from window and door corners
- Hollow-sounding floor tiles over large areas, which suggests poor bedding
- Water pooling on terraces or in shower trays
- Doors and windows that stick or do not close evenly
- Condensation inside double glazing
Raise all of these in writing before completion. Spain's building warranties, explained in the completion guide, cover finishing defects for one year, habitability defects for three and structural defects for ten.
What you cannot judge on a visit
Some qualities only show over time: how the building copes with a storm, how warm it is in January, how loud the neighbours are. Talking to owners in the developer's earlier projects is the best way to get a sense of these. The developer checks guide explains how to find them.
Key takeaways
- The specification sheet and contract plans define what you are buying; if it is not written down, it is not promised.
- Ask for brands, ranges and exact inclusions instead of brochure phrases.
- Check which floor area the price is based on: useful, built or built including common areas.
- At handover, inspect room by room, test everything and send a numbered, photographed defect list in writing.
- Damp, diagonal cracks, hollow tiles and standing water deserve attention before you sign the deeds.
Frequently asked questions
What is a memoria de calidades?
The specification sheet listing the materials and systems in a new building. It should be attached to your purchase contract and is the reference for judging what you receive.
Should I hire a snagging surveyor?
It is optional. A surveyor brings tools and experience, and an independent report can carry weight with the developer. A careful buyer with a thorough checklist can also do a good job.
Can the developer change the materials?
Contracts often allow substitution with materials of similar quality. Ask for that to be defined, for example by naming the brand and range or a technical specification.
Sources
- Código Técnico de la Edificación · Ministerio de Vivienda y Agenda Urbana
- Ley 38/1999 de Ordenación de la Edificación (LOE), art. 17 · BOE
This guide is general information for buyers, written in November 2026. It is not legal, tax or financial advice. Rules and rates change, and your circumstances matter, so check the details with an independent Spanish lawyer or tax adviser before you sign or pay.