The Complete Guide to Buying a New-Build Property in Andalucía

Every stage from first viewing to collecting the keys, and who should be beside you at each one

6 min read · Last reviewed 16 November 2026 · ActivoHome editorial team

This guide answers

  • What are the steps from searching to ownership?
  • Who do I need?
  • What should happen before I sign or pay?

Buying a brand-new home in Andalucía is a different exercise from buying a resale flat. You are often buying something that does not exist yet, from a company rather than a person, with payments spread over a year or two. The good news: Spanish law gives off-plan buyers real protection, provided you use it. This guide walks through the whole process in order, so you know what comes next and what should already be in place before you hand over money.

From first search to keys: the new-build routeFrom first search to keys: the new-build routeThe usual order of events for an off-plan or recently finished home in Andalucía1Shortlist and visitWeeks 1–8Compare developments, read the specification sheet (memoria de calidades) and visitthe site and the area at different times.2Get your NIE and a Spanish bank accountStart nowYou need a foreigner's tax number (NIE) to sign anything at a notary. Start early:appointments can take weeks.3Hire an independent lawyerBefore reservingYour lawyer checks the developer, the land, the building licence and the contractbefore you pay more than a reservation.4Reserve the unitReservationA reservation agreement takes the home off the market. Read the refund terms: when,and why, you get it back.5Sign the private purchase contractContractThis sets the price, the payment schedule, the delivery date and the specification.Each stage payment needs a bank guarantee or insurance in your name.6Stage payments during constructionBuild phasePay only into the special account named in the contract, and collect the individualguarantee certificate for every payment.7Snagging inspectionPre-completionWalk the finished home with a checklist or a surveyor. List defects in writingbefore you sign the deeds.8Sign the deeds at the notaryCompletionPay the balance, collect the keys and the documents: first-occupancy paperwork, theten-year insurance policy and the user manual.9Register, connect and settle inAfter completionThe deed is filed at the Land Registry; switch utilities into your name and registerfor local taxes.Source: ActivoHome summary of Spanish purchase practice · ActivoHome guides
The nine stages of a typical Andalusian new-build purchase. Your lawyer should be on board before you pay anything beyond a refundable reservation.

Before you fall for a show flat

Two pieces of admin take longer than most people expect, so start them while you are still browsing.

Your NIE. The Número de Identificación de Extranjero is your Spanish tax ID. You cannot sign the deeds without one, and banks need it to open an account. You can apply at a Spanish consulate in the UK or through a police station appointment in Spain. A lawyer can also apply for you with a power of attorney.

A Spanish bank account. You will pay stage payments, community fees and local taxes from it. Some banks open non-resident accounts remotely; others want you in a branch.

While those are in progress, do your homework on the homes themselves. Read the memoria de calidades (the specification sheet), study the plans, and visit the area at different times of day. Our guides on assessing build quality and assessing a location cover what to look for.

Build your team early

Who does whatWho does whatThe people involved and whose side they are onYouMake decisions, sign, pay into guaranteed accountsonly.Your lawyer (abogado)Works for you alone. Checks title, licences,contract, guarantees.Developer (promotor)Builds and sells. Must guarantee every paymentbefore handover.BankHolds stage payments, issues guarantees; lends ifyou need a mortgage.Notary (notario)Public official. Reads the deed aloud, checksidentities and payments. Neutral, not youradviser.Land RegistryRecords you as the legal owner. Your proof oftitle.Gestor / tax adviserFiles taxes and paperwork; useful for ongoingnon-resident returns.Snagging surveyorInspects the finished home and lists defectsbefore you sign.Colour key: terracotta = you · navy = on your side · grey = the other party · green = neutral officials · gold = optional helpersActivoHome guides
The notary is neutral and the developer is the other side of the deal. Your lawyer is the only professional whose job is to protect you.

The most common mistake foreign buyers make is assuming that someone in the process is looking after them. The developer's sales team is paid to sell. The notary is a neutral public official who checks the deed is lawful and that you understand it; they do not check whether the deal is a good one for you. The only person whose job is to protect your interests is your own independent lawyer, so instruct one before you pay anything beyond a refundable reservation.

Ask any lawyer you shortlist:

  • Do you work for developers or estate agents as well? (You want someone who does not act for the seller.)
  • Is your fee fixed or a percentage, and does it include IVA?
  • Will you check the developer, the land, the licence and the guarantees, and report to me in writing in English?
  • Can you sign on my behalf with a power of attorney if I cannot travel?

Reservation: taking the home off the market

Once you choose a unit, the developer will ask you to sign a reservation agreement and pay a reservation amount. This is the stage where buyers feel pressure ("three other people want this one"), and it is the stage to slow down.

Read what the document says about refunds. A good reservation agreement states that the money is returned if your lawyer's checks reveal a problem, or if the private contract is not signed within a set number of days. It should also say the amount will be deducted from the price. If the reservation is described as non-refundable in all circumstances, ask your lawyer before signing.

The private purchase contract

Usually within a few weeks of reserving, you sign the contrato privado de compraventa. This is the document that matters most until completion. It should state:

  • the exact unit, its plans and the specification sheet as annexes
  • the price, with IVA shown separately
  • the payment schedule and the special bank account for stage payments
  • the expected delivery date and what happens if it is missed
  • that every payment before completion is covered by a bank guarantee or insurance policy in your name

That last point is a legal requirement in Spain, not a favour. Our guide on protecting off-plan payments explains how the guarantee works and what to do if the developer does not offer one. Before you sign, your lawyer should also have completed the legal checks on the land, licence and developer.

During construction

How long the build takes depends on the size of the project; your contract gives the expected delivery date. During this time:

  • Pay only into the account named in the contract. Never pay into a personal account or a different company, however the request is worded.
  • Collect a guarantee certificate for each payment. One general policy for the whole development is not enough on its own; you should have a document in your name covering your money.
  • Keep a folder. Contract, receipts, guarantees, emails about changes or delays. If something goes wrong, this is what your lawyer will ask for.
  • Watch the dates. If the build is falling behind, raise it in writing early.

You may be offered upgrades or changes (a different kitchen, extra sockets). Get each change, and its price, confirmed in writing.

Snagging and completion

When the building is finished, the developer obtains the paperwork that allows occupation. In Andalucía this is now usually a declaración responsable de ocupación under the regional planning law (LISTA) rather than the older first-occupation licence. You will then be called to the notary to sign the deeds (escritura de compraventa).

Before that date, inspect the home with a checklist or a professional snagging surveyor. Write down every defect and send the list to the developer. Signing with some defects outstanding is normal; signing without a written record of them is the thing to avoid. Our completion and snagging guide has the full handover routine.

At the notary you pay the balance, the developer's guarantees are released, and you receive the keys. Make sure you also leave with copies of: the occupancy paperwork, the ten-year structural insurance policy, the energy certificate and the building's user manual (libro del edificio).

After the keys

Your lawyer or gestor files the purchase taxes and sends the deed to the Land Registry, which records you as owner. That registration is your real proof of ownership, so ask for confirmation when it is done. Then:

  • put the electricity, water and internet contracts in your name
  • register with the town hall for IBI (local property tax) and rubbish collection charges
  • join the community of owners and set up the direct debit for fees
  • if you do not live in Spain, set up your annual non-resident tax filing

Our guide to the annual costs of ownership covers those ongoing duties.

What does it all cost?

On top of the price, expect around 12% in taxes and fees at standard Andalusian rates for a new build: 10% IVA, 1.2% stamp duty (AJD), plus notary, registry and paperwork, and your lawyer's fee. The real cost guide works through an example.

A short checklist before any money moves

  • NIE and Spanish bank account under way
  • Independent lawyer instructed, fee agreed in writing
  • Lawyer has checked the developer, land title and building licence
  • Reservation refund terms understood
  • Private contract names the special account and the delivery date
  • Guarantee in your name for every payment before completion

Key takeaways

  • Get your NIE and a Spanish bank account started early; both can take weeks.
  • Hire an independent lawyer before paying more than a refundable reservation. The notary is neutral and the developer is the other side.
  • Every payment before completion should go into a named special account and be covered by a guarantee in your name.
  • Inspect the finished home and send a written defect list before signing the deeds.
  • Budget roughly 12% on top of the price for taxes and fees on a new build, plus your lawyer.

Frequently asked questions

Can I buy a new build in Andalucía without travelling to Spain?

Yes. Many buyers give their lawyer a power of attorney, signed at a Spanish notary or at a UK notary with an apostille, so the lawyer can sign the deeds and handle paperwork for them.

How long does an off-plan purchase take?

From reservation to keys, roughly the length of the remaining build, which your contract states as a delivery date. A finished home can complete within weeks once your checks are done.

Is the notary my lawyer?

No. A Spanish notary is a neutral public official who checks identities, explains the deed and records it. They do not negotiate or protect your commercial interests; that is your own lawyer's job.

Do I need a mortgage in principle before reserving?

If you plan to borrow, get an indication from a lender or broker before you reserve, because non-residents can usually borrow only 60–70% of the price.

Sources

  1. Ley 38/1999 de Ordenación de la Edificación (LOE), consolidated text · BOE
  2. Ley 7/2021 de impulso para la sostenibilidad del territorio de Andalucía (LISTA) · BOE
  3. Impuestos al comprar vivienda en Andalucía 2026 · Interforo Abogados, 13 April 2026
  4. ITP y AJD en Andalucía · Guía Fiscal, 7 November 2026

This guide is general information for buyers, written in November 2026. It is not legal, tax or financial advice. Rules and rates change, and your circumstances matter, so check the details with an independent Spanish lawyer or tax adviser before you sign or pay.

Keep reading

All guides →
Ten checks on a developerTen checks on a developerMost of these take minutes online or a request through your lawyer1Company identityFind the legal company name and tax ID (CIF)on the contract, not the brand name on thebillboard.→ Contract, website legal notice2Who is behind itDirectors, incorporation date and recentchanges are published in the companiesgazette.→ BORME / Registro Mercantil3Filed accountsLook at the last two or three years ofannual accounts: equity, debt and whetherthey were filed on time.→ Registro Mercantil (cuentas anuales)4Insolvency recordSearch the company and its directors in thepublic insolvency register.→ Registro Público Concursal5Owns the landThe plot should be in the developer's nameand any loan on it should be clear to you.→ Nota simple, Land Registry6Building licenceA granted licence (licencia de obras) with areference you can check with the town hall.→ Ayuntamiento7Payment guaranteesNamed bank or insurer for your deposits, anda special account for stage payments.→ Contract, guarantee draft8Delivered beforeFinished projects you can visit. Talk toowners about delays and how defects werehandled.→ Site visits, owners9Ten-year insuranceAsk which insurer will provide thecompulsory ten-year structural policy(seguro decenal).→ Developer, at completion10Straight answersA sound developer sends documents whenasked. Delay or pressure is information too.→ Your own notesSource: BORME, Registro Mercantil, Registro Público Concursal, Ley 38/1999 (LOE) · ActivoHome guidesDue diligence · 4 min readHow to Check if a Property Developer Is TrustworthyTen checks you can run in an afternoon, and the warning signs that mean stopRead the guide →The legal document stackThe legal document stackWhat should exist, and when, before you hand over more money1Nota simpleBefore reservingLand Registry extract: who owns the plot, mortgages, charges, easements.2Planning status (PGOU)Before reservingZoning confirms the land is urban and the building matches the plan.3Building licenceBefore contractLicencia de obras granted by the town hall for this project.4Catastro recordBefore contractCadastral reference and value; must match the Registry description.5Payment guaranteeWith each paymentBank guarantee or insurance covering all money paid before keys (Ley 20/2015).6Declaration of new workBefore completionEscritura de obra nueva and horizontal division create your flat as a legal unit.7Occupancy paperworkBefore completionIn Andalucía, a responsible declaration of occupation under LISTA (Ley 7/2021)replaces the old licence for most new builds.8Ten-year insuranceAt completionSeguro decenal for structural defects: compulsory for new homes under the LOE.9Energy certificateAt completionRating label (A–G) must be provided at sale.Source: Land Registry, Catastro, Ley 20/2015 DA1, Ley 7/2021 (LISTA), Ley 38/1999 (LOE) · ActivoHome guidesDue diligence · 5 min readLegal Checks Before Buying Property in SpainThe documents that prove a new home is legal, and the questions your lawyer should answer in writingRead the guide →Which payments need a guaranteeWhich payments need a guaranteeIllustrative schedule on a new-build purchase↑ 2% Reservation18%Contract20%Stage payments60%Balance at deedsPaid before keys: must be guaranteed (bank guarantee or insurance)Paid at the notaryExample only: payment schedules vary from one developer to another.The reservation is usually a fixed sum; ask whether it is credited, refundable and guaranteed.Every payment before handover should go into the special account named in your contract,and you should receive an individual guarantee certificate in your name for each one.Source: Ley 38/1999 (LOE), additional provision 1 as amended by Ley 20/2015 · ActivoHome guidesMoney & costs · 4 min readBuying Off-Plan: How to Protect Your Deposit and PaymentsBank guarantees explained, when to pay, and what happens if the build is late, cancelled or the developer goes bustRead the guide →