Buying Off-Plan: How to Protect Your Deposit and Payments

Bank guarantees explained, when to pay, and what happens if the build is late, cancelled or the developer goes bust

4 min read · Last reviewed 16 November 2026 · ActivoHome editorial team

This guide answers

  • What is a bank guarantee?
  • When should I pay?
  • What happens if construction is delayed, cancelled or the developer becomes insolvent?

Off-plan buying means paying for a home months or years before you can live in it. That is the trade for choosing your unit early, often at a lower price and with some say over finishes. The risk is obvious: what happens to your money if the building is never finished? Spain answered that question in law. Since 1968 developers have had to guarantee buyers' advance payments, and the current rules sit in the first additional provision of the Building Act (LOE), rewritten in 2015. Used properly, they are strong protection.

What the law requires

In short, a developer selling homes before completion must:

  • guarantee every amount you pay before handover, plus statutory interest, with a bank guarantee (aval bancario) or an insurance policy (seguro de caución) from an authorised Spanish or EU institution
  • pay that money into a special account, kept separate from the developer's other funds and used only for the construction
  • refer to the guarantee in the contract, and give you the document that proves your money is covered

The guarantee answers if construction does not start or is not finished within the agreed time, or if the occupancy paperwork is not obtained. You can then terminate the contract and claim your money back from the bank or insurer, rather than chasing the developer.

Collective policy vs individual certificate

Developers usually arrange one collective policy or guarantee line for the whole development. That is fine, but it is not enough by itself. You should receive an individual certificate in your name for the amounts you have paid. Ask for it after every stage payment, check that the amount matches what you paid, and keep the originals or certified copies safe.

When to pay, and how

Which payments need a guaranteeWhich payments need a guaranteeIllustrative schedule on a new-build purchase↑ 2% Reservation18%Contract20%Stage payments60%Balance at deedsPaid before keys: must be guaranteed (bank guarantee or insurance)Paid at the notaryExample only: payment schedules vary from one developer to another.The reservation is usually a fixed sum; ask whether it is credited, refundable and guaranteed.Every payment before handover should go into the special account named in your contract,and you should receive an individual guarantee certificate in your name for each one.Source: Ley 38/1999 (LOE), additional provision 1 as amended by Ley 20/2015 · ActivoHome guides
An illustrative 40/60 schedule. Everything you pay before the deeds are signed should be covered by an individual guarantee.

A typical off-plan purchase has three money moments:

  1. Reservation. A fixed amount to take the unit off the market. Ask whether it is refundable if your lawyer's checks fail, and whether it is covered by the guarantee once the contract is signed.
  2. Private contract and stage payments. A percentage at signing, sometimes followed by instalments during construction. Each one goes into the special account and gets a guarantee certificate.
  3. Balance at the deeds. Paid at the notary when the keys are handed over. No guarantee is needed for this part, because you receive the home in exchange.

Good payment habits:

  • Pay only by bank transfer to the special account named in the contract. Never cash, never a personal account, never a different company "for administrative reasons".
  • Check the account holder's name on every transfer.
  • If an email changes the bank details, phone the developer on a number you already have before sending anything. Payment fraud using fake emails is common across Europe.
  • Do not pay ahead of the schedule to secure a discount unless that payment is also guaranteed.

What if things go wrong?

What if things go wrong?What if things go wrong?How your guarantee works in four scenariosConstruction is lateCheck the contract's delivery date and anygrace period. Once it passes, you can chooseto wait or to terminate.If you terminate, claim the guaranteed sumsplus statutory interest from the bank orinsurer.Project cancelled or never startedThe guarantee exists for this case. Yourlawyer sends a formal demand to theguarantor.Expect to provide the contract, paymentproofs and your guarantee certificates.Developer becomes insolventGuaranteed money sits outside theinsolvency; you claim against the guarantor,not in the queue of creditors.Unguaranteed money becomes an ordinary claimin the insolvency, often recovered only inpart.No occupancy paperworkWithout it the home cannot be lawfullyoccupied or connected for supply in thenormal way.This is also a trigger for the guarantee. Donot sign the deeds until it is in place.Source: Ley 38/1999 (LOE), DA1 · ActivoHome guides
The four situations the guarantee is designed for. Time limits apply, so speak to your lawyer as soon as a date is missed.

The build is late. Contracts usually give a delivery date, sometimes with a short grace period. Once it passes, you can choose to wait or to terminate. If you terminate, the guarantee covers the amounts paid plus statutory interest. Talk to your lawyer before deciding: some delays are short and the home is still worth having. The law sets a time limit for demanding termination and claiming on the guarantee once the deadline is missed, so do not sit on it.

The project is cancelled or never starts. This is exactly what the guarantee is for. Your lawyer sends a formal demand to the guarantor, with the contract, proof of payments and your certificates.

The developer becomes insolvent. Guaranteed money is claimed from the bank or insurer, outside the insolvency. Money that was not guaranteed becomes an ordinary claim in the insolvency, where creditors often recover only part of what they are owed, after a long wait.

There is no guarantee at all. Spanish courts have, in a number of cases, held the bank that received buyers' payments liable even where no individual guarantee was issued, on the basis that it should have checked. That is a route for lawyers to explore after the fact, not a plan. Insist on the guarantee from day one.

The documents to keep

  • Reservation agreement and receipts
  • Signed private contract with all annexes
  • Bank transfer confirmations showing the special account
  • Individual guarantee certificates, one per payment
  • All emails about dates, changes and delays

Questions to ask before you sign

  1. Which bank or insurer is providing the guarantee?
  2. What is the special account number, and in whose name is it?
  3. Will I receive an individual certificate after each payment, and how long does it take?
  4. What is the delivery date, and is there a grace period?
  5. Is the reservation amount covered by a guarantee and is it refundable?

If the answers are vague, ask your lawyer to raise them before the contract is signed. Once the money has gone, your bargaining position is weaker.

Key takeaways

  • Spanish law requires developers to guarantee every payment made before completion, plus statutory interest.
  • Get an individual guarantee certificate in your name for each payment, not just a reference to a collective policy.
  • Pay only by transfer into the special account named in the contract, and verify any change of bank details by phone.
  • If the delivery date passes or the occupancy paperwork is missing, you can terminate and claim from the guarantor.
  • Act quickly when a deadline is missed: the law sets time limits for claiming.

Frequently asked questions

What is an aval bancario?

A bank guarantee. For off-plan homes, it is the bank's promise to refund the buyer's advance payments, plus statutory interest, if the developer fails to deliver on time or obtain the occupancy paperwork.

Does the guarantee cover the reservation fee?

It depends on how the reservation is handled. Ask the developer whether the reservation is paid into the special account and covered once the contract is signed, and get the answer in writing.

Do I need a guarantee for the final payment?

No. The balance is paid at the notary in exchange for the deeds and the keys.

What if the developer goes bankrupt?

Guaranteed amounts are claimed from the bank or insurer that issued the guarantee. Unguaranteed amounts become a claim in the insolvency proceedings.

Sources

  1. Ley 38/1999 de Ordenación de la Edificación, additional provision 1 (as amended by Ley 20/2015) · BOE
  2. Ley 20/2015 de ordenación, supervisión y solvencia de las entidades aseguradoras, final provision 3 · BOE

This guide is general information for buyers, written in November 2026. It is not legal, tax or financial advice. Rules and rates change, and your circumstances matter, so check the details with an independent Spanish lawyer or tax adviser before you sign or pay.

Keep reading

All guides →
Ten checks on a developerTen checks on a developerMost of these take minutes online or a request through your lawyer1Company identityFind the legal company name and tax ID (CIF)on the contract, not the brand name on thebillboard.→ Contract, website legal notice2Who is behind itDirectors, incorporation date and recentchanges are published in the companiesgazette.→ BORME / Registro Mercantil3Filed accountsLook at the last two or three years ofannual accounts: equity, debt and whetherthey were filed on time.→ Registro Mercantil (cuentas anuales)4Insolvency recordSearch the company and its directors in thepublic insolvency register.→ Registro Público Concursal5Owns the landThe plot should be in the developer's nameand any loan on it should be clear to you.→ Nota simple, Land Registry6Building licenceA granted licence (licencia de obras) with areference you can check with the town hall.→ Ayuntamiento7Payment guaranteesNamed bank or insurer for your deposits, anda special account for stage payments.→ Contract, guarantee draft8Delivered beforeFinished projects you can visit. Talk toowners about delays and how defects werehandled.→ Site visits, owners9Ten-year insuranceAsk which insurer will provide thecompulsory ten-year structural policy(seguro decenal).→ Developer, at completion10Straight answersA sound developer sends documents whenasked. Delay or pressure is information too.→ Your own notesSource: BORME, Registro Mercantil, Registro Público Concursal, Ley 38/1999 (LOE) · ActivoHome guidesDue diligence · 4 min readHow to Check if a Property Developer Is TrustworthyTen checks you can run in an afternoon, and the warning signs that mean stopRead the guide →The legal document stackThe legal document stackWhat should exist, and when, before you hand over more money1Nota simpleBefore reservingLand Registry extract: who owns the plot, mortgages, charges, easements.2Planning status (PGOU)Before reservingZoning confirms the land is urban and the building matches the plan.3Building licenceBefore contractLicencia de obras granted by the town hall for this project.4Catastro recordBefore contractCadastral reference and value; must match the Registry description.5Payment guaranteeWith each paymentBank guarantee or insurance covering all money paid before keys (Ley 20/2015).6Declaration of new workBefore completionEscritura de obra nueva and horizontal division create your flat as a legal unit.7Occupancy paperworkBefore completionIn Andalucía, a responsible declaration of occupation under LISTA (Ley 7/2021)replaces the old licence for most new builds.8Ten-year insuranceAt completionSeguro decenal for structural defects: compulsory for new homes under the LOE.9Energy certificateAt completionRating label (A–G) must be provided at sale.Source: Land Registry, Catastro, Ley 20/2015 DA1, Ley 7/2021 (LISTA), Ley 38/1999 (LOE) · ActivoHome guidesDue diligence · 5 min readLegal Checks Before Buying Property in SpainThe documents that prove a new home is legal, and the questions your lawyer should answer in writingRead the guide →The 1-3-10 building warrantiesThe 1-3-10 building warrantiesPeriods run from handover, under Ley 38/1999 (LOE)KeysYr 1Yr 2Yr 3Yr 4Yr 5Yr 6Yr 7Yr 8Yr 9Yr 101 year: finishing defectsPaint, tiles, doors, small fittings and other finishes.3 years: habitability defectsDamp, leaks, insulation, faulty installations.10 years: structural defectsFoundations, beams, load-bearing walls. Backed by compulsory insurance.Source: Ley 38/1999 de Ordenación de la Edificación, art. 17 · ActivoHome guidesHandover & ownership · 5 min readCompletion, Snagging, Warranties and Your Rights Against the DeveloperWhat to check before handover, what to do if the home is late or defective, and how the 1-3-10 warranties workRead the guide →