Images © ABA Homes, from the developer's website.
- 450 m from the beach
- Penthouses with private rooftop solarium
- Infinity pool and padel court
- Aerothermal hot water
About ABA Homes Playa II
ABA Homes Playa II is the second phase of ABA Homes Playa in Santa Rosa, Torrox Costa, built directly beside the first phase and about 450 m from the beach. It is a single building of 10 homes, eight of which are offered for sale, sold directly by the developer that builds it.
The first and second floors hold six apartments: one-bedroom homes of about 53 m² built and two-bedroom homes of 82–87 m² built. On the top floor are two two-bedroom penthouses, each with a private rooftop solarium of around 45 m². A garage space with a storage room can be bought separately, and prices are given on request.
Homes are fitted with ducted air conditioning, aerothermal heat-pump hot water and motorised blinds in the bedrooms. Residents share the communal areas of the first phase, which include an infinity pool, a padel court, a petanque court and a children's play area.
Homes in this development
| Home | Bedrooms | Built area | Terrace | Price from |
|---|---|---|---|---|
| 1-bedroom apartment | 1 | 53 m² | – | On request |
| 2-bedroom apartment | 2 | 82–87 m² | – | On request |
| 2-bedroom penthouse | 2 | 82–87 m² | – | On request |
Features
Shared facilities
- Infinity pool
- Children's play area
- Padel court
Location
- Walking distance to the beach
Getting around
- Beach m450
Location
Map position is approximate. Open larger map
More new homes nearby
See all in Axarquía →
Under constructionHorus TorroxFrom €328,0001–3 bed · ApartmentExpected completion Q3 2028 (estimate)Salsa InmobiliariaView →
Key-readylandCo Torrox CostaFrom €200,0001–3 bed · ApartmentCompleted Q3 2026 (estimate)LandCoView →
Under constructionMarinsa AltairFrom €200,0001–3 bed · Ground-floor apartment, Apartment, PenthouseExpected completion Q1 2027 (estimate)Marinsa PromocionesView →
Under constructionSea Views by Puerto NarixaFrom €295,000Ground-floor apartment, Apartment, PenthouseExpected completion Q1 2027 (estimate)Desarrollos Ecosostenibles 14View →








