Images © Kronos Homes, from the developer's website.
- 104 homes with Mediterranean views
- Terraced layout among pine woodland
- Two pools, spa, sauna and gym
- Home automation in every home
About Kosmos
Kosmos is a Kronos Homes development of 104 homes on high ground in Torremolinos, surrounded by pine woodland and facing the Mediterranean. The buildings are arranged in horizontal tiers that follow the slope, which the developer says maximises both views over Torremolinos and the Málaga coastline and the privacy of each home. The site is close to the centre of Torremolinos, Málaga city and the airport. Works have started.
The homes are two- and three-bedroom apartments and penthouses of roughly 80 to 109 m² inside, with generous terraces; top-floor homes have terraces and sun areas of up to 50 m². Interiors include a home-automation system. Listed two-bedroom homes run from €425,000 to €442,000, three-bedroom homes from €515,000 to €601,000, and a three-bedroom penthouse is listed at €802,000, all excluding VAT.
Residents share two pools, a communal garden, a spa with sauna, a gym and a coworking space.
Homes in this development
| Home | Bedrooms | Built area | Terrace | Price from |
|---|---|---|---|---|
| 2-bedroom apartment | 2 | 79.1–95.3 m² | – | €425,000 |
| 3-bedroom apartment | 3 | 105.1–109.3 m² | – | €515,000 |
| 3-bedroom penthouse | 3 | 96.7 m² | 50 m² | €802,000 |
Features
Shared facilities
- Communal swimming pool
- Landscaped communal gardens
- Co-working space
Wellness
- Gym
- Spa
- Sauna
View
- Sea views
- Panoramic views
Location
Map position is approximate. Open larger map
More new homes nearby
See all in Costa del Sol →
Under constructionEdipsa PosidoniaPrice on request2–4 bed · Apartment, Ground-floor apartment, PenthouseExpected completion Q2 2028 (estimate)EdipsaView →
Off-planEklipseFrom €418,0001–3 bed · ApartmentExpected completion Q2 2029 (estimate)Kronos HomesView →
Key-readyHabitat Alborán BoraFrom €778,5002 bed · Ground-floor apartment, PenthouseCompleted Q3 2026 (estimate)Habitat InmobiliariaView →
Under constructionMiró ResidencialPrice on request1–3 bed · Apartment, Ground-floor apartmentExpected completion Q4 2027 (estimate)Grupo RosmarinoView →






